With the round-the-clock efforts of Asakco colleagues, the early production plan of Sepehr and Jafir fields was successfully implemented, achieving a daily oil production of 24,000 barrels per day from 12 drilling wells.
Asako Website Updates
We are honored to announce that ASAKCO was recently able to achieve Certificate of Qualification for Consulting Services.
Some Projects in Progress
DETAILED DESIGN OF THE EARLY PRODUCTION OF SEPEHR AND JUFAIR FIELDS DEVELOPMENT PROJECT | |
Client | Petroleum Engineering and Development Company (PEDEC) |
EPC Contractor | Pasargad Energy Development Company |
Technical Category | Oil & Gas Field Development |
Services Performed | Detailed Design of Early Production |
Project Status | Ongoing |
CONSTRUCTION & COMMISSIONING PROJECT OF HOMA, VARAVI & TABNAK COMPRESSOR STATIONS – PIPELINE CONSTRUCTION | |
Client | Iranian Central Oil Fields Company |
EPC Contractor | Persian Rad Group |
Technical Category | Oil & Gas Field Development |
Services Performed | Detailed Design |
Project Status | Ongoing |
BIBI HAKIMEH FIELD DEVELOPMENT | |
Client | National Iranian South Oil Company (NISOC) |
EPC Contractor | SeaLand Engineering and Well Services |
Technical Category | Oil & Gas Field Development |
Services Performed | Detailed Design |
Project Status | Ongoing |
ZELOI OIL FIELD DEVELOPMENT | |
Client | National Iranian South Oil Company (NISOC) |
EPC Contractor | Global Petro Tech Kish Company |
Consultant | Tarh Andishan Consulting Engineering |
Technical Category | Oil & Gas Field Development |
Services Performed | Detailed Design |
Project Status | Finished |
Asakco’s Business Areas
- Feasibility studies
- Conceptual Design
- Basic Design (Basic Study)
- Advanced Basic Engineering (Feed Engineering)
- Detailed design (Detail Engineering)
- Economic estimate of the project (Bill of Quantities)
- Preparation of tender documents (EPC, PC, EPCF, IPC and…)
- Workshop Engineering (Filed Engineering)
- Preparation of construction plans (As-Built)
- Supervision
- Holding tenders
- Project management and provision of specialized human resources
- Integrity Management (PIMS)
- Corrosion Management (CMP)
- Risk Based Inspection (RBI)
- Development of inspection plans (CM/PM)
- Wellhead and collection
- facilities
- Ground surface facilities for oilexploitation
- Desalination and oil sweetening facilities
- Separation and gas pressure boosting units
- Oil pumping stations
- Oil and gas pipelines
- Gas and liquid gas factories
- Refinery and petrochemical units
- Skid Mounted installations and units
- Process and safety engineering department
- Piping engineering and modeling department
- Pipeline engineering department
- Department of Mechanical Engineering
- Civil and structural engineering department
- Architectural engineering department
- Department of electrical engineering
- Department of control and instrumentation engineering
- Department of Telecommunication Engineering
Strengths of Asakco
Project Management, Planning & Control
Providing management reports in a clear and graphical format, using powerful tools and software such as Power BI, Tableau, or QlikView.
Process Design & Simulation
Optimal design and simulation of process equipment, using the latest engineering software and with an expert team.
Providing Product Engineering Services
Engineering, monitoring, and supervision of the production process, ensuring timely delivery of project equipment, timely project progress, and optimal construction quality.
CEO’s speech
Asakco colleagues are working to address the environmental damage caused by oil and gas fuel. They are focusing on implementing flare gas collection projects, which will not only reduce pollution but also create valuable products. These efforts prioritize both environmental protection and economic benefits.